Prospect House

Cluny, Aberdeenshire

true

Project Gallery

Scope

The project was phased over a four year period and the extensions took five months to complete.

Environment

To ensure the glass was correct, a 3D laser survey of the partially built extension was undertaken to produce a pointcloud image from which the glass could be sized mm perfect

Fact

The oak timber cladding to the extensions is a sustainable product, chosen for its longevity, durability and aesthetics.

Technical

To compensate for the large area of glass used in the extension, the original house was well insulated to ensure lower running costs.

Project feedback

Jane Taylor