Douglas Dickie

Aberdeen

true

Project Gallery

Scope

The project was only on site for 3 weeks. This was achieved by having large parts of the fitout, including joinery units, prepared off-site.

Environment

The glow ball feature lighting to the front of the shop which displays feature frames, was designed and procured by JAMstudio.

Fact

A minimal colour palette was used which included walnut joinery, white walls with just a hint of cyan fabric to selected areas of the shop.

Technical

Douglas Dickie is part of the Duncan and Todd group. The Mannofield store is the first in a series of fitouts to be designed by JAMstudio in